Friday, August 29, 2014

Estate Lane Improvements On-Going

Estate Lane Improvements:
Last Week:
·         Humir Construction, the underground contractor, completed needed storm sewer repairs throughout the neighborhood..

 Next Week:
·         Depending on work progress, contractor scheduling, and weather, the concrete contractor may begin removing and replacing concrete sidewalks and curb & gutter as needed.

Have a safe and enjoyable Labor Day Weekend!!!

Friday, August 22, 2014

Chatham Road Improvements Completed

Work Completed last week:
Arrow Road, Paving Contractor
·         Partial pavement removal and replacement (MARS) at various locations within the Village including:
o   West Lake Avenue
o   Lehigh Avenue
o   Chestnut Avenue
o   Glenview Road
o   Fir Street
o   Evergreen Terrace
·         Chatham Road from Glenview Road to south end:
o   Existing pavement removal
o   Asphalt patching
o   Paved new asphalt surface 

Landscape Contractor
o   Installed topsoil and seed along Covert Road and Huber Lane.

Work Remaining to be completed:
·         Partial pavement removal and replacement along Central Road
·         Landscape restoration at southeast end of Chatham 

Estate Lane Improvements:
Last Week:
·         American Underground, the sewer televising contractor, cleaned and televised remaining section of existing storm sewer.
·         Humir Construction, the underground contractor, started storm sewer repairs.

Next Week:

·         Humir Construction to continue working on storm sewer repairs. It is anticipated that all underground work will be completed by the end of the week.

Concrete sidewalk and curb & gutter repairs are not anticipated to begin until after the Labor Day weekend.

Friday, August 15, 2014

Chatham Road and Estate Lane Improvements to Begin Next Week.

Work Completed last week:
·         No work completed due to rain at the beginning of the week and scheduling conflicts.

Anticipated work next week includes:
Arrow Road, Paving Contractor
·         Partial pavement removal and replacement at various locations within the Village along arterial roadways including:
o   West Lake Avenue
o   Lehigh Avenue
o   Chestnut Avenue
o   Central Road
·         Chatham Road from Glenview Road to southerly end:
o   Pavement removal
o   Patching of existing asphalt pavement where required
o   Asphalt surface paving 

Estate Lane Improvements to begin including:
o   Cleaning and televising of existing storm sewer system
o   Spot storm sewer repairs 
 
Landscape Contractor
o   Installing topsoil and performing cleanup work on the previously paved sections of Covert Road and Huber Lane.

Friday, August 8, 2014

Partial Pavement Removal and Replacement along Various Roadways to Continue Next Week.

Work Completed last week:
Arrow Road (Roadway Improvements):
·         Partial pavement removal and replacement at various locations within The Glen residential neighborhoods along:
o   Tanglewood Drive
o   Saratoga Lane
o   Monterey Drive
o   Independence Avenue
o   Constitution Drive
o   Primrose Lane
o   Indigo Lane

Anticipated work next week includes:
Arrow Road (Roadway Improvements):
·         Partial pavement removal and replacement at various locations within the Village along arterial roadways including:
o   West Lake Avenue
o   Lehigh Avenue
o   Chestnut Avenue
o   Central Road

Landscape Contractor
o   Installing topsoil and performing cleanup work on the previously paved sections of Covert Road and Huber Lane. 

Thanks again for your patience and understanding as we rehabilitate several roadways within the Village. We apologize for the delays and inconvenience this work causes to daily traffic.

Once the partial pavement removal and replacement along the arterial roadways is completed, a majority of the work associated with the 2014 MFT project will be completed. The remaining items to be completed include the asphalt resurfacing on Chatham Road, various landscape restorations, and other miscellaneous items. The 2” asphalt removal and replacement on Chatham Road is scheduled to begin later this month with Nicor Gas finishing their work on Chatham by the end of next week.    

However, the work along Estate Lane is just beginning. It is anticipated that underground utility cleaning and repairs will begin in the next 1 to 2 weeks. The blog posts will continue to inform those residents of the construction progress along Estate Lane, but that will be the only consistent work.

Friday, August 1, 2014

Pavement Patching in Glen Neighborhoods to Begin Next Week

Work Completed last week:
o   Unfortunately due to scheduling conflicts and equipment break-downs, much of the work anticipated to be completed last week was unable to be performed. The work scheduled for this past week is now scheduled for next week.

Anticipated work next week includes:
Arrow Road (Roadway Improvements):
·         Partial pavement removal and replacement at various locations within The Glen residential neighborhoods along:
o   West Lake Avenue
o   Shermer Road
o   Saratoga Lane
o   Monterey Drive
o   Independence Avenue
o   Constitution Drive
o   Primrose Lane
o   Indigo Lane

Residents will be notified of work performed within the area and any parking restrictions.

We apologize for the inconvenience of the construction work within your neighborhoods and along your streets.