Work Completed last week:
Arrow Road (Roadway Improvements):
·         Glenlake Estates Neighborhood
o   Paved asphalt surface along entire neighborhood.
o   Completed asphalt patching of driveways where concrete curb & gutter or sidewalk repairs were made. 

Anticipated work next week includes:
Suburban Concrete (Concrete Improvements):
·         Concrete curb & gutter and sidewalk replacements along:
o   Covert Road from Washington Road to Michael Manor
o   Huber Lane from Central Road to northerly cul-de-sac.
·         Residents have been notified regarding timing of the construction and access restrictions to their driveways.

Arrow Road (Roadway Improvements):
·         No work anticipated.

Landscape Contractor:
·         Glen Lake Estates Neighborhood
o   Install topsoil and seed behind the concrete curb & gutter and sidewalks that were previously replaced and clean up any remaining construction debris.
·         Glenview Public Library Parking Lot south of Glenview Road
o   Install topsoil and seed behind the concrete curb & gutter that was previously replaced. 