Saturday, July 12, 2014

Concrete Work on Covert and Huber Continues

Work Completed last week:
Suburban Concrete (Concrete Improvements):
·         Concrete curb & gutter, sidewalk, and driveway replacements along:
o   North side of Covert Road from Washington Road to Michael Manor
o   West side of Huber Lane from Central to northerly cul-de-sac

 Landscape Contractor:
·         Glen Lake Estates Neighborhood
o   Installed topsoil and seed behind the concrete curb & gutter and sidewalks that were previously replaced.
·         Glenview Public Library Parking Lot south of Glenview Road
o   Installed topsoil and seed behind the concrete curb & gutter that was previously replaced.

Anticipated work next week includes:
Suburban Concrete (Concrete Improvements):
·         Concrete curb & gutter, sidewalk, and driveway replacements along:
o   South side of Covert Road from Washington Road to Michael Manor
o   East side Huber Lane from Central Road to northerly cul-de-sac, including cul-de-sac
·         Residents have been notified regarding timing of the construction and access restrictions to their driveways.

Landscape Contractor:
·         Glenview Public Library Parking Lot south of Glenview Road
o   Complete installation of topsoil and seed behind the concrete curb & gutter that was previously replaced. 

We apologize for the inconvenience of the construction work within your neighborhoods and along your streets. Thank you for your patience and understanding while you are unable to utilize your driveways.