Friday, June 13, 2014

South Public Library Parking Lot and Glenlake Estates Concrete Repairs On-Going

This past week, Arrow Road completed pavement removal and/or asphalt paving  as part of the 2014 Resurfacing Project along the following roadways:
·         Grove Street from Spruce to Roosevelt
·         Hawthorne Lane from East Lake Avenue to Elmwood Avenue 

The following neighborhoods/street sections were completed as part of the MARS program:
·         Tall Trees subdivision along Sequoia Trail, Blackthorn Drive, Redbud Land, and Silverwillow Drive
·         Rolling Pass from Central Road to north end
·         Kings Lane from Wagner Road to Brandon Road (Paving to be complete on Saturday, June 14, 2014)
·         Pleasant Lane from Wagner Road to west dead end
·         Brandon Road from 2000 block to south dead end
·         Queens Lane from Wagner Road to east dead end
·         Balmoral Avenue & Court from Linden Lane to north dead end
 
Humir Construction, the underground contractor, performed manhole adjustments within the Glenlake Estates neighborhood. 

Suburban Concrete began concrete curb & gutter and sidewalk removals within the Public Library parking lot south of Glenview Road and the Glenlake Estates neighborhood.  The contractor only removed the curb & gutter and sidewalk in the Glenlake Estates neighborhood that does not restrict access to driveways at this time and prior to the weekend. 
 
Anticipated work next week includes:

Suburban Concrete (Concrete Improvements):
·         Glenlake Estates Neighborhood:
o   Not all residents in the neighborhood will have concrete repairs that restrict access to their driveways.  Residents that are affected will be notified via a separate letter prior to access being restricted.
o   Complete spot concrete curb & gutter and sidewalk removal.
o   Pour new concrete curb & gutter and sidewalks in areas previously removed. 

Arrow Road (Roadway Improvements):
·         Public Library parking lot south of Glenview Road:
o   Milling existing asphalt pavement
o   Installing new asphalt surface layer
o   Pavement marking
·         Partial Pavement Removal and Asphalt Paving as part of the MARS program along:
o   Strawberry Lane:  between Maple Leaf and Winnetka Road
o   Indian Ridge Court: Indian Ridge Drive to South cul-de-sac
o   Maple Leaf: between Pfingsten Road and Strawberry 

Humir Construction (Underground Utility Improvements)
·         Perform underground utility repairs and installations along Covert Road (Washington to Micheal Manor) and Huber Lane (Central Road to North Cul-De-sac) 

Thank you for your patience and understanding during these roadway improvements throughout the Village. We understand that work within your neighborhoods can be disruptive and cause delays.  